Detailed Description
Side tipping/tipper/dump enclosed semi trailer truck
Trailer Details show:

Introduction of production processA.Steel auto cutting
B.Main beam autosubmerged arc welding
C.chassis reversal
D.shot blasting for rust cleaning
E,F.Welding by experienced worker
G.Final cleaningwelding slagH.Dust-free painting

SpecifacitionTare weight | 8400kg |
Size | 9140mm*2500mm*3500mm |
Payload | 40T |
Main beam | Heavy duty and extra durability designed Ibeam; opting for high tensile steel T700, welded by automatic submerged-Arc processes. Top flange 14mm,width140mm;Middle Flange 8mm height500mm;bottom flange14mm,width 140mm |
Side beam | standard |
Cross member | standard |
Floor | 3mm |
Side wall | height 1300mm thickness 4mm T700 |
Cylinder | HYVA brand |
Axle | 3 axle FUWAbrand 13T |
Suspension | American type suspension |
Leaf spring | 10pcs*13mm*90mm |
Tire | 11.00R20 triangle brand 13pcs |
Wheel rim | 8.0-20 jingubrand 13pcs |
Kingpin | 2"bolt-in king pin |
Landing gear | two-speed, manual operating ,heavy duty landing gear 28T |
Twist lock | no |
Braking system | WABCO RE6 relay valve ;T30/30 spring brake chamber;40L air tanks |
ABS | 4S/2M |
Light | LED 8 side lights and 2 rear lights 2 width lamp |
Painting | Complete chassis sand blasting to clean rust ,1coat of anticorrosive prime,2coats of final paint |
Accessories | One standard tool box,one spare tire carrier,one crank,one shaft headwrench,four side light,two rear light |
Date of delivery | 5 workdays after we received 30% of contract value T/T down payment. |
Trailer advantages description·More than
20 years professional design and production experience.
·Choose Regular manufacturers purchase materials,likebaoshan.
·Use Domestic first-class production equipment.Main beam is useing
Submerged arc welding process.·Famouse brand trailer parts used,like
bpw/fuwaaxle,triangle/double star/double cointires,china famouse brand cylinder and so on.
·Strict quality co
ntrol system ensure that each semi trailer is qualified.
DeliveryWax spray and Nude
Warranty period and after sale service
FAQ·MOQ:1 SET
·Delivery date:25 workdays after we received deposit.
·Payment term:
1. 30% co
ntract value as the deposit by T/T,70% co
ntract value payoff before delivery after production finish.
2. 40% co
ntract value as the deposit by T/T,60% co
ntract value made by irrevocable L/ Cat sight.
Welcomeyour inquiryand visit our factory.

Product Image
ABOUT US