Introduction of Electric Table Transfer Cart
BWP series electric flatbed table transfer cart is a kind of trackless material handling trolley, which means it can run on cement floor and no need to install rails. The steerable electric table transfer cart has at lest two casters, which could realize 360 degree motorized rotation without causing any damage to the floor. It is powered by storage battery, so it can turn freely without any cable strings. This electric trackless transfer cart is co
ntrolled to go forward and backward, turn left and right by pssing the buttons and speed controller. It also can be added with PLC co
ntrol system for full automation.

Features of Electric Table Transfer Cart
----Low noise It causes low noise level.
----Maximum safety Offers guarantee of maximum safety for operators and for the material handled. We really care a
bout the safety of everyone involved in the job.
----Easy for operation These transfer carts are easy to drive, so as soon as you get it you will be able to use it to transport your loads. We will support you to make the best out of your heavy load transporter.
---- Easy to implement into manufacturing processOperates on standard floors; Do not require complex or permanent installation
----Suitable for All Kinds of Weight Thebattery powered trolley is superb for handling both small and extremely huge loads for its modular fabrication and its high payloads: up to 300 ton for each trolley.

Production Process of Electric Table Transfer Cart
CNC Cutting
Transport the steel plate from raw material warehouse to CNC cutting workshop for cutting. After the cutting, the workers will do some simple processing such as chip moving and setting out.
Preliminary Assembling
Put the cut steel plate together according to the design drawing
Welding
Weld the steel plate with automatic welding machine after the pliminary assembling
Post weld treatment
Test the welding section after the welding, polish and burring. Post weld treatment to eliminate welding stress
Spray Primer
Transport the structure part after processing to painting booth for spraying primer. The main compo
nent of the primer is zinc rich epoxy antirust paint. The primer is to two layers
Assembling
Assemble the structure parts after spraying primer with wheels, motors and gear box, etc.
Paint finish
Transport the assembled cart to painting booth, inspect the integrity of primer. After that paint the finish
Debugging
Debugging the cart after painting the finish with electric co
ntrol system, after the debugging, the cart will test without load. And after the no load test, the cart will be tested with load. After the inspection, the cart will be transported to storage area.

Production Supply Scope
Product Name | Model | Power Supply Mode | Load Capacity | Running distance | Usage |
Rail Transfer Cart | BDG | Conductor Rail | We can design 1-300t load transfer cart. The load capacity and table size is customized according to the working condition and the client's requirements.
| ≤70m | Ordinary goods,such as steel plate, workpiece,equipment etc special goods,such as coil. column,ladle etc |
Battery Powered Transfer Car | BXC | Battery | Unlimited |
Cable powered Transfer Trolley | BJT | Cable Drum | ≤50m |
Electric Transfer Cart | BTL | Trailing Cable | ≤20m |
Busbar Powered Handling Cart | BHX | Busbar | Unlimited |
Towed Rail Trailer | BP | Towed by other machine | Unlimited |
Steerable Towed Car | BWT | Manually or towed by forklift or other machine | 1-150t on cement or steel floor. | Unlimited |
Trackless Handling Machine | BWP | Battery | Unlimited |
Packaging & Shipping
*For lengthis less than 6m, the width is less than 2.2m.Electric Railroad Carwill be transported by 20ft container. If the length is lo
nger than 5.9m and less than 12m, it will be transported by 40ft container. If the quantity is 2 sets or 3 sets, they can be transported by full container. If the quantity is 1 set, it can be transported by LCL Container.
*If the length is less than 12m, the width is beyond 2.2m. Electric Railroad Car needs to be transported by flat rack (20 or 40 ft) . If the equipment is beyond above dimension, and quantity need to co
nsider bulk cargo.

Company Strength
We treat the integrated management idea as a crucial tool to realize value for the benefits and requirements of the final customers and to promotethe business on the natio
nal and internatio
nal markets.
The co
ntinuous tenacity of the quality management methodmakes our company to take respo
nsibility for the handling problems of the customers and to solve and provide the most suitable way from a functional, technical, quality and commercial viewpoint.