6mx1m Double Side 1000KG Long Span Cargo Storage Cantilever Rack

Main Feature&Compo
nents for Sunli Cantilever rack
The "Christmas tree" theory behind cantilever rack is what makes it so appealing.
There are four main parts to the cantilever rack concept:
+ Uprights: vertical columns in the back that are bolted to a ba
se
+ ba
ses: To maintain the balance during weight-laden from cantilever arms
+ Arms: strong "limbs" extending out from the uprights
+ Braces: the hardware holding the arms, uprights, and ba
se together
Technical Des
cription for cantilever rack system
Style | long items storage, lumbers, aluminium profile storage
Plywood storage, steel tubes, wooden crates storage |
Thickness | Column/bases/cantilever arms: 2.0mm~4.0mm
Connectors/braces: 1.5~1.8MM |
Cantilever arm length | Max 1200MM(1000KG laden)
( the shorter of arm, the stronger loading on each arm) |
Column length | Cantilever arm length + extra 400~500MM
|
MOQ | 2 units
|
The width between columns | 400MM~1500MM
( narrow space will make stronger loading on cantilever ) |
Material | Made of Q235B steel
|
Lead time | 25~30days( regardless of purchase quantities)
|
Stock | We donot have any stock for cantilever rack system
( all sizes are made purpose/perosnal-designed) |
Colour | RAL 5015( blue) + RAL 2004(Orange)
|
Load | Load capacity is 500kg to 1TON per arm
|
Detailed Image for Double Side cantilever rack

Different project for cantilever rack system


Please inform us following information to get prompt offer for cantilever rack system+ The dimensions of single rack unit ( or palletized load des
criptions)
+ The palletized payload
+ Row of racks( single row, back-to-back row or multiple rows)
+ How many palletized load within one unit
( Please refer to the
Product Description on the top)
FAQ1, What is MOQ limitation for double side cantilever rack?
++ NO. But large purchase will bring competitive prices, 20FT co
ntainer ( 10T~13T) is highly recommended, so that production can be better handled.
2, What is the lead time in Sunli?
++ As per 20FT co
ntainer loading, manufacture time is a
bout 21days; Regarding some customized items 25~27days will be covered.
3, What is payments methods Sunli can accept?
++ T/T and L/C are welcomed.
4, How a
bout Sunli's sample delivery?
++ Short section of uprights and beams can be provided free of charge. But the freight will be collected upon your duty.
5, What is warranty for Sunli's rack system?
++ All rack items will be warrantied against manufacture's defects.
++ To avoid any shortage or missing components, we will provide 1%~2% spare parts besides basic ones.